Hi,
We've loaded a demo of Visual Importer Standard
We're direct loading into SQL Server from Oracle. This looks OK. After this has been set up is there any way of scheduling (via DTS or any other way) a series of loads to happen automatically (i.e. after we set up the loads , is there a hands-off way of running it)
Thanks
Warren